闺蜜舌头进去我下面好爽_chinese69videos国产hd_亚洲电影成人成人影院_老女人一级片

新聞資訊
公司新聞 行業(yè)動態(tài)

【The power of Ticom Tech】the railway at the doorway, the Ticom at the doorway

 
 


Ningqi railway compound line electrification project will be put into operation by the end of this year



Ningqi railway goes across the middle of Jiangsu Province. It is an important part of the national rapid railway network and the intercity rail network in the Yangtze River Delta region. After the electrification transformation of the compound line, the speed is raised to 200 kilometers per hour. On 7th , according to Yangzhou railway office, the project will conduct debugging in September this year and will be officially put into operation by the end of this year.



Yin Jianping, director of the Yangzhou railway office, said that now there are 4 railways under construction in Jiangsu and 7 new railways. By 2020, the main railway line in Jiangsu province will have a mileage of over 4000 kilometers, and the rapid railway will have a mileage of over 2400 kilometers. The rapid railway network with the structure of "four vertical and three horizontal" will be basically formed. The six main traffic arteries in Yangzhou include Ningqi railway and Huaiyang Town Railway(under construction), Shanghai Shaanxi Expressway and Beijing Shanghai Expressway, the Yangtze River and Beijing Hangzhou the Grande Canale.They converge in Yangzhou and form three major traffic pivot points.



Ningqi railway electrification project has a total length of 268.3 km, with a total investment of 12.71 billion yuan. Ningqi railway starts from Nanjing Linchang station,goes across Liuhe, Yizheng, Yangzhou, Jiangdu, Taizhou, Jiangyan, Haian, Rugao, Nantong, and arrives in Qidong. It was originally a national I single line railway with a design speed of 120 km / h. When the electrified transformation of the compound line is completed, its speed will be raised to 200 kilometers per hour. The line will be open at the end of this year. At that time, it will take only 40 minutes for Yangzhou people to get to Nanjing by high-speed train, which will go along  Yangzhou, Taizhou and Nantong.

As a local railway communication equipment suppliers in Nanjing , we should make contribution to the local railway construction. All base stations are provided by Ticom Tech and we are proud of it. What do you think of it ?



 
 
 

上一條:Ticom Tech and Kapsch sign a strategic cooperation agreement on a new generation of base station technology

下一條:[Industry 4.0] A visit to the SIEMENS Amberg factory